Wastewater and Solids-Laden Liquids

Industrial / Wastewater and Solids-Laden Liquids


The mandate:
During a plant shutdown, empty a 500,000-gallon water treatment basin for inspection and maintenance.

Pumpaction’s added value:
With our job site mobilization service, we were able to deliver a made-to-measure, turnkey solution. The dedicated Pumpaction team installed and started up a high-capacity wastewater pump with 12-inch HDPE pipes at the customer’s site and monitored the job site.
    Location: Quebec City
     
    Customer: White Birch Paper
>